The installations under the central road are already prepared, and the foundations of most houses have been poured.
The building structures are quickly evolving — the load-bearing walls of the ground and first floor of the first houses have already been executed.
At the same time, the first clients are finalizing their individual changes, and the architects, along with the investor, are taking care of selecting the facade materials to ensure beautiful and qualitative houses.
The over 500 characteristic trees of Wiedeńska Residence are being carefully protected.
What sets Wiedeńska Residence apart is its exceptional care for nature.
As part of the development, over 500 trees have been preserved, creating a natural green canopy that ensures privacy and tranquility.
Download the brochure to learn more about Wiedeńska Residence.